WEATHERPROOF DISTRIBUTION PANEL: Panels capable of housing more than two single pole circuits shall have a main breaker. Size of conductors from meter base to panel will depend on size of panel. Refer to current edition of NEC for required conductor size. OUTLETS: The service must have at least one outlet below the breaker panel. All outlets must be of the GFCI type, OR should be protected.. Temporary electrical power for decorative holiday lighting and similar purposes is permitted for a period of up to 90 days. Once that clock runs out, you have to remove the temporary electrical power [590.3 (B)].
Temporary for construction Construction work requires electrical power for many purposes. However, exposure to weather, frequent relocation, rough use and other condi-tions not normally encountered with conventional wiring systems necessitate special consideration not required in other applications or in completed structures. The application of this data sheet is limited to the electrical.. PEC follows the National Electrical Code (NEC), which offers guidelines on materials and construction procedures for meter loops and other electrical applications. For your protection, PEC urges you or your electrician to use only NEC-approved procedures and materials. All meter loops must be sized according to the load to be served and NEC guidelines.